Ordinance of 1 November 2017 on Energy
-
Abbreviation
:
Energy Ordinance
-
Provision
:
Art. 9k
-
Short description
:
Public list of information on wind turbines.
-
Nature of the provision
:
Obligation to publish data
-
Status
:
In force
-
Sector
:
Energy
Legal text :
a. opening of a public inquiry into an application for planning permission, stating the site of the wind turbine, the installed capacity of the turbine and the expected annual electricity generation;
b. initial licensing;
c. commencement of licences;
d. withdrawal of applications and surrender of licences.
2 If a turbine is commissioned, its operator shall immediately inform the SFOE in writing, stating the installed capacity and expected annual electricity generation.
3 The SFOE shall maintain a publicly accessible list of the information referred to in paragraphs 1 and 2 and keep it updated.
Actor with an obligation to share data
Swiss Federal Office of Energy
Beneficiaries
All
Linking criteria for Switzerland
Linking criteria for Switzerland
Financial aspects
Free
Binding and/or enforceable
Mandatory
Conditions for accessing data
/
Exceptions and limitations
/
Static data
Format
No required format
Compilation and Disclaimer
This index was prepared on behalf of the IPI by the law firm id est avocats Sàrl (for the section on Swiss law) and the law firm Pierstone (for the section on European law).
This index does not constitute legal advice, and no guarantee is given regarding its completeness.
Neither id est avocats Sàrl, nor Pierstone, nor the IPI or the FDJP can be held liable for any decisions or actions taken on the basis of this index.